The four-story office building welcomes visitors, members, and employees of the AmperVerband company in its modern premises. The entrance area of the partially glazed facade includes inclined, V‑shaped composite steel columns spanning two floors.
As part of the urban development of Metz, a new gymnasium is under construction, featuring advanced engineering techniques and a commitment to sustainability. The project combines LC spruce GL24h cross-beams, steel columns, and insulated concrete precast walls to ensure the stability of the structure. The timber roof structure serves as a support for the photovoltaic panels. BET Moselle Bois, a customer of Dlubal Software, was responsible for the structural analysis and design.
Quai M, which is the name of the new concert hall, opened in September 2022 and includes two halls for concerts as well as rehearsal and recording rooms. The project replaces the city's old "Fuzz'Yon" concert room, providing a new and modern space for music.
A new timber structure can be admired in Monbijoupark in the city of Bern, Switzerland. The gazebo was built during the park renovation and is to be used as a meeting place in the future. The unusual shape is particularly eye-catching and fits perfectly with the surroundings.
This project aims to rehabilitate, extend, and enhance the former Haras ice rink, located near the Château d'Angers, a castle in the city of Angers, belonging to the ABF sector (Architectes des Bâtiments de France). The aim is to create a modern sports facility that meets the needs of the local community while preserving the existing architectural heritage.
Edelweiss Industrial Park Münchwilen combines modern office space and storage facilities with a production hall. The timber structure, with a timber-concrete composite ceiling, forms an interesting structure that is an excellent example of modern and efficient construction.
The triple sports hall with a saw-tooth roof built in the German town of Stuttgart-Waldau impressively shows the sustainable perspectives of modern timber structures. The trusses arranged in the shape of boxes ensure optimal daylight.
A modern 6-seater chairlift called sixpack Mooslehen opened in Filzmoos, Austria on December 17, 2021, right on time for the start of the ski season. The construction time for the entire project was only six months. The company m3-ZT, an Austrian customer of Dlubal, was responsible for the structural analysis, using the FEA program RFEM.
The Infrastructure department of SDEA Engineering Solutions has extensive experience in the railroad sector, especially in designing electrification using overhead contact lines (OCS/OLE), where it has developed projects for high-speed trains in England and streetcar lines in Norway.
The village center in Kappl, Tyrol, Austria includes three separate structures forming a U shape. The total area of all three components is 911,118 ft³ and includes a café, retail shops, and visitors' center, as well as a large multipurpose hall.
The station building is an organic shaped steel structure consisting of three connected parts. The left and right building sections are formed by curved Vierendeel truss beams extruding from the main Vierendeel truss down to the reinforced concrete foundation. These main trusses are supported by a row of columns with additional vertical bracing.
The former Diamond Exchange in Amsterdam, now known as Capital C, has been restored to its former glory after a radical renovation. This national monument has not only been returned to its original shape, but also includes a new steel-and-glass roof.
This project was designed using BIM technology. During the documentation process, IFC files were used for the data exchange. The architectural building model was first created in REVIT, then exported to RFEM to apply loads and complete the full structural analysis and design.
In June 2018, a new and unique lookout tower by world-famous architect Martin Rajniš opened in the Prague municipal district of Kyje. When designing the tower, maximum emphasis was placed on the use of natural and renewable material.
The lookout tower structure is constructed with acacia logs 3.15 inches in diameter. The main supporting structure includes three legs, where a spiral staircase is also suspended. The tower legs are made of a lattice structure in the shape of an elongated barrel. At the top, the legs are interconnected with three steel hoops and a triangular steel structure.
The tower is 77.1 ft high with the observation platform located 65.5 ft above ground elevation. The observation tower can hold up to 9 people during typical operation.
For a project in Rotterdam, ADS Ertner used IDEA CONNECTION to analyze a structural steel connection. This program calculates steel connections utilizing the CBFEM method, where each thin-walled cross-section is modeled with nonlinear material properties, nonlinear bolts, and nonlinear welds. In order to transfer loads, ADS Ertner needed to use blocks in the connection model. In IDEA CONNECTION, blocks are not easily integrated with thin-walled plates.
In the Chinese province of Qinghai, near the city of Haixi, a complex of 23 multi-energy plants is being built, combining different technologies to generate energy from renewable resources. The complex comprises a 618.4-foot-high tower of the 50 MW solar power plant; the support structure is expected to be completed in mid-2019.
The solar power plant uses modern CSP (Concentrated Solar Power) technology, which enables the storage of thermal solar energy, thus ensuring continuous power generation even at night.
Following remodeling, the TD Place Stadium in Canada’s capital, Ottawa, can hold up to 24,000 visitors. The sports complex is located at Lansdowne Park and is primarily used for Canadian football and soccer. The architectural highlight of the stadium is the curvilinear timber veil.
Within a short period of time, a modern aluminum structure with sophisticated building services was constructed for the company Hydro Aluminium in Grevenbroich.
The construction project on the premises near Düsseldorf covers approximately a length of 722 ft and a width of 394 ft. It includes various connecting bridges to the existing premises, a three-aisle production hall with outbuildings, and a 328-foot-long and 99-foot-high high-rack warehouse, which was constructed in slipform paving technology.
The treetop trail in the Giant Mountains (Czech: Krkonoše) is the second experience trail created by eak (Erlebnis Akademie AG) in the Czech Republic.
Over a length of 4,922 ft, it twists through the treetops of the mixed mountain forest. It ends at a lookout tower with a height of around 141 ft, and its platform offers a breathtaking view over the Krkonoše National Park.
A kindergarten, designed according to Building Information Modeling (BIM), is currently under construction in the Tyrolean municipality of Schwoich. The digital 3D model accompanies the construction project from design until completion.
The architectural planning was performed with Autodesk Revit. The structural model, including cross-sections, materials, loads, and so on, was exported to RFEM with the direct interface and designed there.
A timber lookout tower called "Ester" opened in Jerusalem in mid-November 2017. This tower, in the shape of a blooming cactus, was designed by renowned Czech architect Martin Rajniš and is located in the complex of a former hospital from 1887, not far from the Old Town walls. It offers visitors a spectacular view over Jerusalem.
With the Crossrail railroad line in Great Britain, one of the biggest infrastructure projects of Europe is in progress. The construction costs for the 73-mile railroad line amount to about €21 billion. It runs from Reading in Berkshire in the west to Shenfield in Essex in the east, crossing through the center of London.
A branch line runs under the Thames to Woolwich and ends at the recently completed Abbey Wood Station. Its extraordinary timber roof construction has the shape of a huge manta ray which seems to hover above the station.
Modern design methods and fabrication techniques of CLT panels allow for easier design and construction of high‑rise timber buildings.
“Îlot bois de Strasbourg” is one of the first CLT building projects in France to exceed 98 ft in height. This building complex, consisting of three high‑rise buildings, provides commercial space on the ground floor and 146 residential units on the upper floors. The entire structure has a total area of 100,104 ft².
The theater, built in 1911-1913, has a varied history. The building was destroyed by Allied air attacks in February 1945, reconstructed in the postwar years, and damaged by floods in August 2002. Within an 18‑week break, the Dresden theater was extensively renovated and modernized.
The S‑shaped pedestrian and cycling bridge across the Neckar River in Germany has a total length of 316 ft and a width of 10 ft, with the middle part being straight.
The "Hemsedal Ski Center" in the Scandinavian Alps is one of the top 3 ski resorts in Norway. It comprises a total of 49 ski slopes and 20 surface lifts. At the foot of the mountainside, a new apartment hotel with 100 modern rooms will be completed by the end of 2017.
A chipboard factory in Germany was renovated at the beginning of 2014. The main structural elements were made of S235 steel hot‑rolled shapes and the structure was set on a slab foundation.
The new headquarters of the Baden Farmers' Association (BLHV) is unique. The timber construction is protected by a glass facade to counteract graying caused by weather conditions. Although the architects of Werkgruppe Lahr have sufficient experience in timber construction, the wooden house with glass cladding has been a "model project" for them.